Aircrane, Inc. Places Rooftop Units at Honda Power Equipment

Shelco recently hired Aircrane, Inc. to place eight (8) 25 ton RTUs on the roof of the Honda Power Equipment – Phase II expansion. Due to the limits of a traditional crane, Aircrane was more timely and cost effective in placing multiple units in multiple locations, all completed in just twenty minutes.

Videos by Kay Heating & Air Conditioning (Walter Ridge Jr. )

“I was very clear with the problems and issues we had encountered with our two previous construction projects with a different contractor, and was not convinced this project with Shelco would be any different. You promised me this project would be seamless, and now I am a true believer.”

—Cyndy White

Administration Manager
NOBEX