Healthcare

From our inception, Shelco has constructed and renovated a variety of healthcare projects including dialysis centers, surgery centers, medical office buildings and hospitals. We are proud to bring quality healthcare facilities to our communities.

Morehead Medical Plaza
Morehead Medical Plaza Exterior

Morehead Medical Plaza

Charlotte, NC

196,000 SF Medical Office Building and 2,900 Space Parking Deck

Morehead Medical Plaza Exterior
  • The first floor required additional slab thickness to accommodate open MRI equipment
  • Precast parking deck completed in less than twelve (12) months
  • Steel frame and composite concrete slab with exterior precast concrete and curtainwall
  • Tight site
Cannon Memorial Hospital
Cannon Memorial Hospital Imaging Room

Cannon Memorial Hospital

Linville, NC

92,000 SF Hospital, 70 Beds; 80,000 SF Medical Office Building

Cannon Memorial Hospital Aerial Shot
Cannon Memorial Hospital Imaging Room
  • The hospital was constructed in sixteen (16) months
  • The office and building facilities were delivered in ten (10) months
  • Emergency department
  • Radiology/Imaging department
  • Operating suites
  • Outpatient facilities and pharmacy
Brown Orthopedics
Brown Orthopedics Rehab Facility

Brown Orthopedics

Fuquay Varina, NC

7,100 SF Medical Office Upfit

Brown Orthopedics Exam Room
Brown Orthopedics Exam Room
Brown Orthopedics Nurse Station
Brown Orthopedics Rehab Facility
Brown Orthopedics Waiting Room
  • Orthopaedics facility
  • Physical medicine and rehabilitation
  • Physical therapy
  • Occupational therapy
  • Cast and X-ray facilities
Duke Clinics
Duke Clinics Exterior Drive Up

Duke Clinics

Durham, NC

29,200 SF Orthopedic Clinic, 8,200 SF Ophthalmology Clinic, 5,100 SF Physical Therapy Clinic

Duke Clinics Waiting Area
Duke Clinics Exterior Drive Up
  • Lutron lighting system
  • Patient drop-off canopy
  • 150 kw back-up generator
  • Thirty-six (36) exam rooms and one (1) cast room
  • Two (2) shielded x-ray rooms with future capacity for two (2) more
  • Lutron lighting system
  • Nurse call system
  • Tele-conferencing room
Morehead Medical Plaza II
Morehead Medical Plaza II Oncology Building Interior

Morehead Medical Plaza II

Charlotte, NC

Oncology Center - 34,000 SF Radiation Treatment Facility

Morehead Medical Plaza II Oncology Building Interior
Morehead Medical Plaza II Oncology Building Interior
Morehead Medical Plaza II Interior Room
  • Building can accommodate a 6-story vertical expansion
  • Two (2) linear accelerators
  • HDR room
  • CT room
  • Procedure and recover rooms
  • High-end paneling and glass walls in lobby
The Park at Monroe
The Park at Monroe Exterior

The Park at Monroe

Monroe

38 Acre Development; 100,000 SF Medical Office Building, 55,000 SF Retail

The Park at Monroe Testing Equipment
The Park at Monroe Imaging Room
The Park at Monroe Exam Room
The Park at Monroe Reception Area
The Park at Monroe Waiting Area
  • Four (4) retail shell buildings
  • Three (3) 2-story MOB’s
  • Ambulatory surgery center and imaging center
  • New medical delivery concept, integrating retail and medical
  • Expanded parking
  • Frontage outparcels with utility connections
Gynecology & Laparoscopic Surgeons, PC
Gynecology & Laparoscopic Surgeons, PC Exam Room

Gynecology & Laparoscopic Surgeons, PC

Raleigh, NC

2,100 SF Medical Office Building Upfit l

Gynecology & Laparoscopic Surgeons, PC Exam Room
Gynecology & Laparoscopic Surgeons, PC Waiting Area
  • 1,400 SF finishes renovation
  • Work completed on schedule and under budget
  • Work completed after hours in existing space not inhibiting daily operations
Waxhaw Medical Office
Waxhaw Medical Office Exterior at Dusk

Waxhaw Medical Office

Waxhaw, NC

30,000 SF Three-Story Medical Office Building

Waxhaw Medical Office Lab Facility
Waxhaw Medical Office Reception Area
Waxhaw Medical Office Exam Room
Waxhaw Medical Office Exterior at Dusk
Waxhaw Medical Office Waiting Area
  • Project includes full ER upfit, X-ray room, helipad, CT scan room and nine (9) exams rooms
  • Negotiated project
  • Generator back up system
  • Six (6) month schedule
  • DHSR inspections
UNC Health Care MRI
UNC Chapel Hill Hospital MRI

UNC Health Care MRI

Chapel Hill, NC

Reworked existing space to accommodate new Siemens MRI Unit

  • Construction completed after hours and weekends
  • Upgraded mechanical, electrical and fire protection systems for the new MRI unit
  • Project completed in less than six (6) weeks
  • DHSR Inspection
  • Negotiated GMP
WakeMed Health and Hospitals | Cary Urology
WakeMed Health and Hospitals | Cary Urology Exam Room

WakeMed Health and Hospitals | Cary Urology

Cary, NC

WakeMed Health and Hospitals | Cary Urology Exam Room
  • Six (6) exam rooms, x-ray room, one (1) lab
  • Three (3) offices and associates support rooms
  • Work completed twelve (12) days ahead of schedule
Novant Health Wallburg Family Practice
Novant Health Wallburg Family Practice Lab

Novant Health Wallburg Family Practice

Wallburg, NC

3,400 SF Medical Office Upfit

Novant Health Wallburg Family Practice Exam Room
Novant Health Wallburg Family Practice Lab
Novant Health Wallburg Family Practice Waiting Area
  • Demised space previously occupied by Dollar General
  • Cut concrete floor and installed under slab plumbing
  • Split the HVAC system and installed VAV boxes and new duct work
  • Installed new water and electrical service to the space
  • Relocated sprinkler system
  • Requested quick ship of equipment and materials
  • Installed custom millwork
  • Created new exit and entrance doors completed twelve (12) days ahead of schedule
UNC Health Care Psych Clinic and Admin Office
UNCHPsych

UNC Health Care Psych Clinic and Admin Office

Chapel Hill, NC

12,527 SF renovation

UNCHPsych
UNCHPsych
UNCHPsych
UNCHPsych
  • 12,527 SF renovation
  • Relocation of psychiatric clinic and administration offices to ground floor
ARAMARK Healthcare Technology and Innovation Center
ARAMARK Healthcare Technology and Innovation Center Classroom

ARAMARK Healthcare Technology and Innovation Center

Charlotte, NC

182,000 SF Warehouse/Distribution Facility

ARAMARK Healthcare Technology and Innovation Center
ARAMARK Healthcare Technology and Innovation Center Lobby
ARAMARK Healthcare Technology and Innovation Center Interior
ARAMARK Healthcare Technology and Innovation Center Classroom
  • Upfit for repairing X-ray,CT, and MRI machines
  • 31,000 SF office renovation and 1,800 SF office upfit
  • Included interior demolition, new administrative office, and mezzanine
  • Technical operations renovations
  • Call center addition and renovation
Novant Matthews Medical Center
Novant Matthews Medical Center Room

Novant Matthews Medical Center

Matthews, NC

7,336 SF

Novant Matthews Medical Center Room
Novant Matthews Medical Center
Novant Matthews Medical Center Room
  • 2nd floor of hospital tower
  • Complete remodel of twenty-three (23) rooms
  • Completed in five (5) phases
  • Completed in five (5) months
  • Labor and delivery area remained active during all phases of construction
Wake Forest University Baptist Medical Center Comprehensive Outpatient Rehabilitation Center
Wake Forest University Baptist Medical Center Comprehensive Outpatient Rehabilitation Center Exterior

Wake Forest University Baptist Medical Center Comprehensive Outpatient Rehabilitation Center

Winston-Salem, NC

214,000 SF

Wake Forest University Baptist Medical Center Comprehensive Outpatient Rehabilitation Center Exterior

 

  • Three-story rehab center
  • 585-car, two-story parking deck
  • Steel framed with composite concrete slabs
  • Exterior walls are brick, precast concrete, porcelain tile and synthetic stucco with a combination of curtainwall, storefront and punch windows
Wilkes Regional Medical Center
Wilkes Regional Medical Center Exterior

Wilkes Regional Medical Center

North Wilkesboro, NC

32,000 SF

Wilkes Regional Medical Center Emergency Room
Wilkes Regional Medical Center Emergency Room Interior
Wilkes Regional Medical Center Reception
Wilkes Regional Medical Center Emergency Room Waiting Area
Wilkes Regional Medical Center Exam Room
  • 12,000 SF Emergency Department Addition
  • 20,000 SF Renovation to Existing Hospital
  • Renovation of Six (6) Operating Rooms
  • The Wilkes Regional Medical Center Addition and Renovation project includes a 12,000 SF addition to the existing emergency department and 20,000 SF renovations to the existing emergency department, HR Areas, and surgical suites. The emergency department work was completed in three (3) phases.
Statesville Dialysis Center
StatesvilleDialysis

Statesville Dialysis Center

Statesville, North Carolina

14,800 SF Dialysis Center

StatesvilleDialysis
StatesvilleDialysis
StatesvilleDialysis
StatesvilleDialysis
StatesvilleDialysis
StatesvilleDialysis
StatesvilleDialysis
  • Forty-eight (48) Patient Treatment Stations
  • 100% emergency generator back up
  • Underground storm water detention devices

 

UNC Health Care Bone Marrow Transplant Unit
UNCH-BMTUnit

UNC Health Care Bone Marrow Transplant Unit

Chapel Hill, North Carolina

18,200 SF Bone Marrow Transplant Unit

UNCH-BMTUnit
UNCH-BMTUnit
UNCH-BMTUnit
  • 24 patient beds
  • Two (2) Isolation rooms
  • 25 ton Hepa Filtered Air Handling Unit
  • 74,000 lbs welded SS supply duct
  • Nurse call system
  • Pressure independent rooms
  • Five (5) phases of construction
North Randolph Dialysis Center
North Randolph Dialysis

North Randolph Dialysis Center

Trinity, NC

10,444 SF Dialysis Center

North Randolph Dialysis
North Randolph Dialysis
North Randolph Dialysis
North Randolph Dialysis
North Randolph Dialysis
North Randolph Dialysis
North Randolph Dialysis
North Randolph Dialysis
  • Twenty-four (24) patient dialysis stations
  • Heat disinfect RO system
  • 100% generator back-up
  • Underground stormwater detention/filter devices
UNC Health Care VIR
UNCH-VIR

UNC Health Care VIR

Chapel Hill, NC

Renovation of Vascular Interventional Radiology (VIR) Room

UNCH-VIR
UNCH-VIR
UNCH-VIR
UNCH-VIR
  • Installation of a “CLEANSUITE” modular ceiling system
  • Multiphase construction
  • Resinous epoxy flooring in the new VIR procedure room
  • Work performed while surrounding VIR spaces were in operation
  • Worked off hours and weekends to accommodate the owner’s schedule
  • Adjacent support spaces were also renovated to accommodate the new VIR equipment
  • New roof top exhaust fan was added
  • Daily meetings with the hospital staff

“You see it’s not all about the place – it’s the people. People and companies like Shelco that are willing to step up when others said it could not be done and find success the old fashioned way – with know-how, commitment, and hard work. If you ever need a reference for your company on a future project, please don’t hesitate to use USCB. I’ve been doing this for about 20 years and I can’t say I’ve seen a better construction firm.”

—Mike Parrott

USCB Facilities Director
University of South Carolina Beaufort