Healthcare
From our inception, Shelco has constructed and renovated a variety of healthcare projects including dialysis centers, surgery centers, medical office buildings and hospitals. We are proud to bring quality healthcare facilities to our communities.

Wallace Cancer Center
Salisbury, NC
30,000 SF Cancer Center
- Fist cancer center in Salisbury, NC
- Linear accelerator (LINAC)
- 20 infusion rooms and 20 exam rooms
- CT simulator and scanner
- Pharmacy

Cotswold Medical Office Building
Charlotte, NC
28,000 SF Medical Office Building and12,800 SF Upfit
- Upfit for Novant Health (Novant Baron, Homesley & Valentine)
- Two-story masonry with a perimeter brick screen wall
- Permeable paver parking lot
- Underground detention system

Duke Primary Care Leesville
Raleigh, NC
13,000 SF Medical Primary Care Space with 21 Exam Rooms
• Demolition and renovation of existing drug store
• Medical primary care space
• 21 exam rooms
• Roof replacement
• Exterior facade and lighting improvements

Twenty 200
Winston-Salem, NC
4,800 SF Renovation
- Optical exam room and office
- Retail area for eyeglasses
- Painted in light and dark contrasting colors to assist the visually impaired in navigating the office and the store

CEENTA Medical Office Building
Fort Mill, SC
30,000 SF Two-Story Medical Office Building
• Precast façade with stained faux wood accent panels
• Entry and architectural features comprised of ACM panels
• Intricate floating acoustical ceilings at main lobby
• Optical shop
• Two procedure rooms
• MRI truck service pad
• Audio rooms with audiology booths
• Eye exam rooms and labs
• Extensive offsite sanitary sewer extension

UNC Health Ground Floor NeuroScience Hospital
Chapel Hill, NC
3,700 SF Behavioral Health ED Expansion
- Anti-ligature requirements
- Epoxy resin bathroom flooring
- Hard ceilings throughout the space due to patient population
- Altro Whiterock covered walls throughout all patient areas

Denver Medical Office Building
Denver, NC
26,200 SF Medical Office Building with 42 Exams Rooms
- 2-stories
- Serves six (6) different entities: OBGYN, Family Practice, Urgent Care, Physical Therapy, Time Share and Sports Medicine
- Physical Therapy Room built for state-of-the-art recovery
- Two (2) X-ray rooms, ultrasound room, casting room and procedure room for emergency care

Thomasville Dialysis Center Addition
Thomasville, NC
2,304 SF addition to existing 9,389 SF facility originally constructed by Shelco
- Treatment bay, warehouse, loading dock, and parking lot addition
- Twelve (12) patient dialysis stations added
- Stations featured reverse osmosis, acid, and bicarbonate dialysis systems
- Added fire protection sprinkler system to both addition and existing building space

UNC Health Bone Marrow Transplant Unit
Chapel Hill, North Carolina
18,200 SF Bone Marrow Transplant Unit
- 24 patient beds
- Two (2) Isolation rooms
- 25 ton Hepa Filtered Air Handling Unit
- 74,000 lbs welded SS supply duct
- Nurse call system
- Pressure independent rooms
- Five (5) phases of construction

North Randolph Dialysis Center
Trinity, NC
10,444 SF Dialysis Center
- Twenty-four (24) patient dialysis stations
- Heat disinfect RO system
- 100% generator back-up
- Underground stormwater detention/filter devices

Duke Clinics
Durham, NC
29,200 SF Orthopedic Clinic, 8,200 SF Ophthalmology Clinic, 5,100 SF Physical Therapy Clinic
- Lutron lighting system
- Patient drop-off canopy
- 150 kw back-up generator
- Thirty-six (36) exam rooms and one (1) cast room
- Two (2) shielded x-ray rooms with future capacity for two (2) more
- Lutron lighting system
- Nurse call system
- Tele-conferencing room

UNC Health MRI
Chapel Hill, NC
Reworked existing space to accommodate new Siemens MRI Unit
- Construction completed after hours and weekends
- Upgraded mechanical, electrical and fire protection systems for the new MRI unit
- Project completed in less than six (6) weeks
- DHSR Inspection
- Negotiated GMP

Waxhaw Medical Office
Waxhaw, NC
30,000 SF Three-Story Medical Office Building
- Project includes full ER upfit, X-ray room, helipad, CT scan room and nine (9) exams rooms
- Negotiated project
- Generator back up system
- Six (6) month schedule
- DHSR inspections

Morehead Medical Plaza II
Charlotte, NC
Oncology Center - 34,000 SF Radiation Treatment Facility
- Building can accommodate a 6-story vertical expansion
- Two (2) linear accelerators
- HDR room
- CT room
- Procedure and recover rooms
- High-end paneling and glass walls in lobby

Wilkes Regional Medical Center
North Wilkesboro, NC
32,000 SF
- 12,000 SF Emergency Department Addition
- 20,000 SF Renovation to Existing Hospital
- Renovation of Six (6) Operating Rooms
- The Wilkes Regional Medical Center Addition and Renovation project includes a 12,000 SF addition to the existing emergency department and 20,000 SF renovations to the existing emergency department, HR Areas, and surgical suites. The emergency department work was completed in three (3) phases.

Statesville Dialysis Center
Statesville, North Carolina
14,800 SF Dialysis Center
- Forty-eight (48) Patient Treatment Stations
- 100% emergency generator back up
- Underground storm water detention devices

The Park at Monroe
Monroe
38 Acre Development; 100,000 SF Medical Office Building, 55,000 SF Retail
- Four (4) retail shell buildings
- Three (3) 2-story MOB’s
- Ambulatory surgery center and imaging center
- New medical delivery concept, integrating retail and medical
- Expanded parking
- Frontage outparcels with utility connections

UNC Health Psych Clinic and Admin Office
Chapel Hill, NC
12,527 SF renovation
- 12,527 SF renovation
- Relocation of psychiatric clinic and administration offices to ground floor

UNC Health VIR
Chapel Hill, NC
Renovation of Vascular Interventional Radiology (VIR) Room
- Installation of a “CLEANSUITE” modular ceiling system
- Multiphase construction
- Resinous epoxy flooring in the new VIR procedure room
- Work performed while surrounding VIR spaces were in operation
- Worked off hours and weekends to accommodate the owner’s schedule
- Adjacent support spaces were also renovated to accommodate the new VIR equipment
- New roof top exhaust fan was added
- Daily meetings with the hospital staff

Morehead Medical Plaza
Charlotte, NC
196,000 SF Medical Office Building and 2,900 Space Parking Deck
- The first floor required additional slab thickness to accommodate open MRI equipment
- Precast parking deck completed in less than twelve (12) months
- Steel frame and composite concrete slab with exterior precast concrete and curtainwall
- Tight site

WakeMed Health and Hospitals | Cary Urology
Cary, NC
- Six (6) exam rooms, x-ray room, one (1) lab
- Three (3) offices and associates support rooms
- Work completed twelve (12) days ahead of schedule

Wake Forest University Baptist Medical Center Comprehensive Outpatient Rehabilitation Center
Winston-Salem, NC
214,000 SF
- Three-story rehab center
- 585-car, two-story parking deck
- Steel framed with composite concrete slabs
- Exterior walls are brick, precast concrete, porcelain tile and synthetic stucco with a combination of curtainwall, storefront and punch windows

Cannon Memorial Hospital
Linville, NC
92,000 SF Hospital, 70 Beds; 80,000 SF Medical Office Building
- The hospital was constructed in sixteen (16) months
- The office and building facilities were delivered in ten (10) months
- Emergency department
- Radiology/Imaging department
- Operating suites
- Outpatient facilities and pharmacy
“I was very clear with the problems and issues we had encountered with our two previous construction projects with a different contractor, and was not convinced this project with Shelco would be any different. You promised me this project would be seamless, and now I am a true believer.”
—Cyndy White
Administration Manager
NOBEX