Industrial

Since 1978, Shelco has constructed a variety of industrial and distribution facilities for cold and dry goods storage and distribution.  Our extensive warehouse experience over the years has transferred successfully into industrial and manufacturing facilities. We understand that these facilities require fast track scheduling and paying close attention to detail during the slab pour.

Confidential Distribution Center
Amazon

Confidential Distribution Center

Charlotte, NC

105,222 SF Building Expansion and 397,355 SF Warehouse Renovation

Amazon
Amazon
  • Tilt wall construction with 30’ clear height
  • Approximately 42,000 SF of tenant interior build-out
  • Remote trailer parking expansion over approximately three (3) acres adding forty-four (44) additional parking spaces
  • Car parking expansion added 646 additional parking spaces; 345 spaces created by re-purposing existing trailer parking lot
  • Off-site road improvements include installation of +/- 200’ deceleration lane
  • Provided oversight and coordination of the complex conveyor system and support equipment
  • Work completed in approximately five (5) months
Parkdale Mills Tennessee
Parkdale Mills-TN

Parkdale Mills Tennessee

Mountain City, TN

345,000 SF Manufacturing Expansion

Parkdale Mills-TN
Parkdale Mills-TN
Parkdale Mills-TN
Parkdale Mills-TN
Parkdale Mills-TN
  • 370,000 SF selective demolition and reconstruction of existing manufacturing space
  • 13,500 SF office & plant amenity renovations
  • 3,200 LF of new below grade CIP concrete distribution tunnels for support of HVAC system that provides forty- three (43) air changes per hour
  • 7,000 LF of selective slab demolition, excavation and pour back for underground ductwork installation
  • Enhancement and repaving of all support roads and parking lots
BE Aerospace
BE Aerospace

BE Aerospace

Winston-Salem, NC

38,239 SF Testing Area and Warehouse

BE Aerospace
BE Aerospace
BE Aerospace
BE Aerospace
BE Aerospace
BE Aerospace
BE Aerospace
BE Aerospace
BE Aerospace
  • 57,279 SF engineering development laboratory
  • Includes 19,040 SF two-story Class A office space
  • Energy efficient LED lighting throughout
  • Conference areas with state of the art A/V systems
  • Clear span testing areas with overhead cranes
  • On grade and trailer height docks (2 each)
Ashley Furniture Distribution Center
Ashley Furniture Distribution Center Break Areas

Ashley Furniture Distribution Center

Advance, NC

1,040,000 SF Distribution Center Expansion

Ashley Furniture Distribution Center Expansion Aerial Shot
Ashley Furniture Distribution Center Break Areas
Ashley Furniture Distribution Center Expansion Cubicles
  • 668 acre industrial site
  • Pre-engineered metal structure
  • 50,000 SF of 3-level office space
Bosch Rexroth
Bosch Rexroth Exterior

Bosch Rexroth

Simpsonville, SC

120,000 SF Manufacturing/Warehouse

Bosch Rexroth Interior Warehouse
Bosch Rexroth Office
Bosch Rexroth Exterior
  • Bosch Rexroth moved into their office area and was fully operational within 6 ½ months from the start of the project
  • Expandable to 160,000 SF
  • Design/build approach
  • 32’ tall tiltwall
  • ESFR sprinkler system
  • Twelve (12) dock doors and levelers
  • 12,000 SF office area fully furnished
Honda Power Equipment
HondaExpansion

Honda Power Equipment

Swepsonville, NC

49,245 SF Expansion

HondaExpansion
HondaExpansion
HondaExpansion
HondaExpansion
HondaExpansion
  • 1,850 SF conference room with sliding operable dividers
  • 280 2’ x 4’ LED light fixtures
  • 8” thick concrete slab with Euclid Shaker Hardener
  • Four (4) loading docks
  • New slope test hill
Enterprise Park V
EPV

Enterprise Park V

Greensboro, NC

131,200 SF Warehouse

EPV
EPV
EPV
EPV
  • Eight (8) month construction schedule
  • 28’ ceiling height
  • 50’ x 50’ column spacing
  • Tilt up concrete with decorative EIFS accents
  • TPO roof
  • ESFR sprinkler system
  • Slab construction
    • 6-inch stone
    • 6-inch thickness
    • 15 mil poly vapor barrier
    • Duro-Nox sealer
Builder’s First Source
BuildersFirstSource

Builder’s First Source

Greensboro, NC

10,000 SF Office Renovation and 40,000 SF Warehouse Renovation

BuildersFirstSource
BuildersFirstSource
BuildersFirstSource
BuildersFirstSource
BuildersFirstSource
BuildersFirstSource
BuildersFirstSource
BuildersFirstSource
BuildersFirstSource
  • Roof restoration and skylight replacement
  • Stained concrete floors
  • Fifteen (15) acres of paving
Ferguson Box
Ferguson Box Work Area

Ferguson Box

Charlotte, NC

180,000 SF Corrugated Box Manufacturing Facility

Ferguson Box Exterior Shot
Ferguson Box Manufacturing Interior
Ferguson Box Work Area
  • Design/build delivery method
  • 10,000 SF office space with partial open ceiling with campasso trim
  • Rear loading/dock leveler area
  • Special foundation requirements to support equipment loads
DMSI
DMSI Exterior Shot

DMSI

Charlotte, NC

397,800 SF Warehouse

DMSI Exterior Shot
  • The project was on a 114 acre site and the racking system was installed after five (5) months of construction
  • Tiltwall construction
  • “Hybrid” design-build
  • 31’ clear height ceiling
  • Fifty-three (53) dock doors
  • Slab construction includes 6” thickness, 4,000 PSI, no poly, round dowels and standard cure and seal
  • Cast on 1” screenings over cement stabilized subgrade
  • Ashford floor hardener
Caliber Ridge
Caliber Ridge Exterior Shot

Caliber Ridge

Greer, SC

126,000 SF Warehouse

Caliber Ridge Exterior Shot
  • Tiltwall construction with an ESFR sprinkler system
  • Up to six (6) tenant spaces available
  • TPO White fully automated roof system
  • Twenty (20) additional knockouts for future dock doors
  • Twenty (20) truck dock doors
  • One (1) drive-in door
  • Exterior canopy entrance system
Honeywell Expansion
Honeywell Expansion Tilt Panel Warehouse Exterior

Honeywell Expansion

Indian Land, SC

20,000 SF Tilt Panel Warehouse

Honeywell Expansion Tilt Panel Warehouse Exterior
Honeywell Expansion Tilt Panel Warehouse Exterior
Honeywell Expansion Tilt Panel Warehouse Lobby
  • Five (5) month schedule
Crosspoint at Palmetto Commerce Park
Crosspoint1-4

Crosspoint at Palmetto Commerce Park

Charleston, SC

182,000 SF Warehouse/Distribution Facility

Crosspoint at Palmetto Commerce Park Exterior
  • Competitive bid award
  • Multi-tenant shell construction
  • Eight (8) month construction schedule
  • Tilt wall construction
  • Conventional steel structure
  • Nineteen (19) acre mass graded site including extending existing park infrastructure
  • Forty-two (42) overhead doors
  • Rear dock loading
  • ESFR sprinkled with pump
  • 30’ Clear ceiling height
  • 45 MIL TPO roof (R15 insulation)
Parkdale Mills

Parkdale Mills

Gaffney, SC

400,000 SF Plant Renovation

Parkdale Mills Interior
Parkdale Mills Interior
Parkdale Mills Interior
  • Parkdale Mills is the # 1 manufacturer of spun yarn in the world
  • Create 860 new slab openings over tunnels
  • Added over 15,000 SF storage space
  • Demo 1,300 LF 32’ tall interior CMU walls
  • Create 2,500 SF new canteen and quality control lab
  • Patch 540 existing slab on grade openings over tunnels and modify tunnels
  • Six (6) months schedule
Pharr Yarns
Pharr Yarns Interior

Pharr Yarns

9,500 SF Extrusion Building

McAdenville, NC

Pharr Yarns Extrusion Building Exterior
Pharr Yarns Extrusion Building Exterior
Pharr Yarns Interior Shot
Pharr Yarns Interior Shot
Pharr Yarns Interior
  • 64’ clear height
  • Selective demolition of existing operational plant
  • FFFL 125 super flat concrete slab
  • New compressor and electrical rooms, silo foundations and cooling tower
  • Multiple new 3000v switchgear, transformers and distribution systems
  • Application of new waterproofing system at seven (7) existing structures
Harris Teeter Cold Storage
Harris Teeter Cold Storage Interior

Harris Teeter Cold Storage

Greensboro, NC

80,000 SF Freezer Expansion

Harris Teeter Cold Storage Interior
  • Underfloor heating system constructed below the main floor to keep the ground from freezing and heaving
  • -10˚ to – 20˚ temperature zones
  • High bay storage
  • Superflat trap rock floor
  • Office space
Charleston Regional Business Center #2
CRBC II

Charleston Regional Business Center #2

Charleston, SC

340,000 SF Warehouse/ Distribution Center

CRBC II
CRBC II
CRBC II
CRBC II
  • Tilt wall construction
  • Conventional steel structure
  • 86 overhead doors and dock pits
  • Cross-docking
  • ESFR sprinkled with pump
  • 30’ Clear ceiling height
  • 45 MIL TPO roof (R25 insulation)
  • Slab construction
    • 4-inch stone base
    •  6-inch thickness
    • 4,000 PSI
    • Ff 35/Fl 25 slab flatness
Airpark South
Airpark South Aerial Exterior Shot

Airpark South

Greensboro, NC

631,000 SF

Airpark South Aerial Exterior Shot
  • Five (5) industrial warehouses
  • Near Piedmont Triad International Airport
  • Tilt up construction
  • 9” thick concrete walls
  • Bay sizes 50’ x 40’
  • Complete sprinkler system
  • Ballasted roof
Enterprise Park I and II
Enterprise Park II Exterior Shot

Enterprise Park I and II

Greensboro, NC

538,462 SF

Enterprise Park II Exterior Shot
Enterprise Park II Exterior Shot
Enterprise Park II Parking Lot Shot
Enterprise Park I and II Exterior Shot
Enterprise Park I and II
  • Two (2) industrial warehouses
  • 28 and 34 foot ceiling heights
  • 50 x 50 column spacing
  • Tilt up concrete with decorate EIFS accents
  • ESFP sprinkler system
  • TPO roof
  • Slab construction
    • 6-inch stone
    • 6-inch thickness
    • 10 mil poly vapor barrier
    • Lapidolith sealer
Daimler Warehouse
Daimler

Daimler Warehouse

Gastonia, NC

310,000 SF Cross Dock Warehouse Facility

Daimler
Daimler
Daimler
  • Precast wall panels
  • 7,500 SF upfitted interior office space
  • 230,000 SF exterior concrete paving
  • 24 acres fully developed site
  • 8” heavily reinforced SOG with metallic and liquid hardeners
  • Fully conditioned warehouse space
  • ESFR sprinkler system throughout with some in-rack sprinklers
  • Security gates with guard house
  • Fully automated recessed truck scale
Charleston Regional Business Center #4
CRBC IV

Charleston Regional Business Center #4

Charleston, SC

270,000 SF Distribution Center

CRBC IV
CRBC IV
CRBC IV
  • Seven (7) month construction schedule
  • 30’ clear height ceiling
  • Front loading dock
  • Four (4) 12’ high storefront entrances
  • 45 MIL TPO roof (R25 insulation)
  • ESFR sprinkler system
  • Slab construction
    • 4-inch stone base
    • 6-inch thickness
    • 4,000 PSI

 

 

 

“Shelco was able to deliver a high quality finished product while meeting these important milestone dates and staying within budget. This project went extremely well, with no delays, no issues and no change orders! We would recommend Shelco’s team be included in any fast-tracked tenant upfit construction project.”

—Linda B. Lagesse, AVP

Corporate Real Estate & Administration Manager
Sedgwick Claims Management Services, Inc.