Since 1978, Shelco has constructed a variety of industrial and distribution facilities for cold and dry goods storage and distribution. Our extensive warehouse experience over the years has transferred successfully into industrial and manufacturing facilities. We understand that these facilities require fast track scheduling and paying close attention to detail during the slab pour.

Geneva II Warehouse
Charlotte, NC
242,000 SF Warehouse
• Constructed Simultaneously with Cordage Warehouse
• Cast-in-place tilt up concrete walls
• 45 truck docks
• 120 truck hauler parking spaces
• 45 mil TPO roofing system
• Alucobond metal panel entry canopies
• 20 acre property

Cordage Warehouse
Charlotte, NC
212,000 SF Warehouse
• Constructed Simultaneously with Geneva II Warehouse
• Cast-in-place tilt up concrete walls
• 60 truck docks and three drive in roll-up doors
• Sub-slab Vapor Mitigation System
• 45 mil TPO Roofing System
• Aluma Shield Canopies
• 17 Acre Property

Honda Power Equipment GSV Phase I & II
Swepsonville, NC
253,200 SF Precast Building Expansion

OXCO
Fort Mill, SC
216,520 SF Warehouse
• Tilt wall warehouse
• 30’ clear height
• Rear loading facility with 41 dock doors and drive-in ramp
• Two architectural canopied entrances
• Three large retaining walls
• Two detention ponds
• ESFR fire protection

Enterprise Park (Buildings I, II, IV and V)
Greensboro, NC
Total 798,000 SF of Warehouse Space
- Total of four (4) warehouse buildings
- Tilt up concrete with decorative EIFS accents
- 28’ and 34′ ceiling heights
- 50’ x 50’ column spacing
- ESFR sprinkler system
- TPO roof
- Slab construction
- 6-inch stone
- 6-inch thickness

Confidential Distribution Center
Charlotte, NC
105,222 SF Building Expansion and 397,355 SF Warehouse Renovation
- Tilt wall construction with 30’ clear height
- Approximately 42,000 SF of tenant interior build-out
- Remote trailer parking expansion over approximately three (3) acres adding forty-four (44) additional parking spaces
- Car parking expansion added 646 additional parking spaces; 345 spaces created by re-purposing existing trailer parking lot
- Off-site road improvements include installation of +/- 200’ deceleration lane
- Provided oversight and coordination of the complex conveyor system and support equipment
- Work completed in approximately five (5) months

Parkdale Mills Tennessee
Mountain City, TN
345,000 SF Manufacturing Expansion
- 370,000 SF selective demolition and reconstruction of existing manufacturing space
- 13,500 SF office & plant amenity renovations
- 3,200 LF of new below grade CIP concrete distribution tunnels for support of HVAC system that provides forty- three (43) air changes per hour
- 7,000 LF of selective slab demolition, excavation and pour back for underground ductwork installation
- Enhancement and repaving of all support roads and parking lots

BE Aerospace
Winston-Salem, NC
38,239 SF Testing Area and Warehouse
- 57,279 SF engineering development laboratory
- Includes 19,040 SF two-story Class A office space
- Energy efficient LED lighting throughout
- Conference areas with state of the art A/V systems
- Clear span testing areas with overhead cranes
- On grade and trailer height docks (2 each)

Ashley Furniture Distribution Center
Advance, NC
1,040,000 SF Distribution Center Expansion
- 668 acre industrial site
- Pre-engineered metal structure
- 50,000 SF of 3-level office space

Bosch Rexroth
Simpsonville, SC
120,000 SF Manufacturing/Warehouse
- Bosch Rexroth moved into their office area and was fully operational within 6 ½ months from the start of the project
- Expandable to 160,000 SF
- Design/build approach
- 32’ tall tiltwall
- ESFR sprinkler system
- Twelve (12) dock doors and levelers
- 12,000 SF office area fully furnished

Honda Power Equipment
Swepsonville, NC
49,245 SF Expansion
- 1,850 SF conference room with sliding operable dividers
- 280 2’ x 4’ LED light fixtures
- 8” thick concrete slab with Euclid Shaker Hardener
- Four (4) loading docks
- New slope test hill

Builder’s First Source
Greensboro, NC
10,000 SF Office Renovation and 40,000 SF Warehouse Renovation
- Roof restoration and skylight replacement
- Stained concrete floors
- Fifteen (15) acres of paving

Ferguson Box
Charlotte, NC
180,000 SF Corrugated Box Manufacturing Facility
- Design/build delivery method
- 10,000 SF office space with partial open ceiling with campasso trim
- Rear loading/dock leveler area
- Special foundation requirements to support equipment loads

DMSI
Charlotte, NC
397,800 SF Warehouse
- The project was on a 114 acre site and the racking system was installed after five (5) months of construction
- Tiltwall construction
- “Hybrid” design-build
- 31’ clear height ceiling
- Fifty-three (53) dock doors
- Slab construction includes 6” thickness, 4,000 PSI, no poly, round dowels and standard cure and seal
- Cast on 1” screenings over cement stabilized subgrade
- Ashford floor hardener

Caliber Ridge
Greer, SC
126,000 SF Warehouse
- Tiltwall construction with an ESFR sprinkler system
- Up to six (6) tenant spaces available
- TPO White fully automated roof system
- Twenty (20) additional knockouts for future dock doors
- Twenty (20) truck dock doors
- One (1) drive-in door
- Exterior canopy entrance system

Honeywell Expansion
Indian Land, SC
20,000 SF Tilt Panel Warehouse
- Five (5) month schedule

Crosspoint at Palmetto Commerce Park
Charleston, SC
182,000 SF Warehouse/Distribution Facility
- Competitive bid award
- Multi-tenant shell construction
- Eight (8) month construction schedule
- Tilt wall construction
- Conventional steel structure
- Nineteen (19) acre mass graded site including extending existing park infrastructure
- Forty-two (42) overhead doors
- Rear dock loading
- ESFR sprinkled with pump
- 30’ Clear ceiling height
- 45 MIL TPO roof (R15 insulation)

Parkdale Mills
Gaffney, SC
400,000 SF Plant Renovation
- Parkdale Mills is the # 1 manufacturer of spun yarn in the world
- Create 860 new slab openings over tunnels
- Added over 15,000 SF storage space
- Demo 1,300 LF 32’ tall interior CMU walls
- Create 2,500 SF new canteen and quality control lab
- Patch 540 existing slab on grade openings over tunnels and modify tunnels
- Six (6) months schedule

Pharr Yarns
9,500 SF Extrusion Building
McAdenville, NC
- 64’ clear height
- Selective demolition of existing operational plant
- FFFL 125 super flat concrete slab
- New compressor and electrical rooms, silo foundations and cooling tower
- Multiple new 3000v switchgear, transformers and distribution systems
- Application of new waterproofing system at seven (7) existing structures

Harris Teeter Cold Storage
Greensboro, NC
80,000 SF Freezer Expansion
- Underfloor heating system constructed below the main floor to keep the ground from freezing and heaving
- -10˚ to – 20˚ temperature zones
- High bay storage
- Superflat trap rock floor
- Office space

Charleston Regional Business Center #2
Charleston, SC
340,000 SF Warehouse/ Distribution Center
- Tilt wall construction
- Conventional steel structure
- 86 overhead doors and dock pits
- Cross-docking
- ESFR sprinkled with pump
- 30’ Clear ceiling height
- 45 MIL TPO roof (R25 insulation)
- Slab construction
- 4-inch stone base
- 6-inch thickness
- 4,000 PSI
- Ff 35/Fl 25 slab flatness

Airpark South
Greensboro, NC
631,000 SF
- Five (5) industrial warehouses
- Near Piedmont Triad International Airport
- Tilt up construction
- 9” thick concrete walls
- Bay sizes 50’ x 40’
- Complete sprinkler system
- Ballasted roof

Daimler Warehouse
Gastonia, NC
310,000 SF Cross Dock Warehouse Facility
- Precast wall panels
- 7,500 SF upfitted interior office space
- 230,000 SF exterior concrete paving
- 24 acres fully developed site
- 8” heavily reinforced SOG with metallic and liquid hardeners
- Fully conditioned warehouse space
- ESFR sprinkler system throughout with some in-rack sprinklers
- Security gates with guard house
- Fully automated recessed truck scale

Charleston Regional Business Center #4
Charleston, SC
270,000 SF Distribution Center
- Seven (7) month construction schedule
- 30’ clear height ceiling
- Front loading dock
- Four (4) 12’ high storefront entrances
- 45 MIL TPO roof (R25 insulation)
- ESFR sprinkler system
- Slab construction
- 4-inch stone base
- 6-inch thickness
- 4,000 PSI
“By far Shelco has provided the most successful experience with the CM at Risk delivery method to ASU by virtue of their dedication and straight forward dealings with us. I would retain this firm as my first choice on any future CM at Risk project and cannot recommend them highly enough for your committee consideration.”
—Clyde D. Robbins, PhD
Director Design & Construction (Retired)
Appalachian State University