Mission Critical

The mission critical landscape changes rapidly as technology advances.  As our clients’ needs change, Shelco’s commitment of people, resources and technology to each project is as solid as the buildings we construct. Shelco has the experience, the human capital and your best interest in mind to construct your Mission Critical project.

Carolinas HealthCare Data Center
Carolinas HealthCare Data Center Office Interior

Carolinas HealthCare Data Center

Charlotte, NC

100,000 SF

Carolinas HealthCare Data Center Office Interior
Carolinas HealthCare Data Center Servers
Carolinas HealthCare Data Center Server Room
  • The project was an interior renovation and there was zero downtime to hospital IS functions
  • 100,000 SF
  • Two-story building
  • High level redundancy
  • Zero downtime to hospital IS functions
  • State of the art engineering systems
Electrolux Headquarters Expansion
Electrolux Headquarters Expansion Interior

Electrolux Headquarters Expansion

Charlotte, NC

60,000 SF, 2-Story Headquarters Addition

Electrolux Headquarters Expansion Exterior
Electrolux Headquarters Expansion Work Space
Electrolux Headquarters Expansion Interior
  • Tier I facility with 30,000 SF of raised access flooring
  • 6,000 SF addition to existing/in-use cafeteria and serving areas
  • Generator backup power
  • Six (6) month accelerated project schedule
GSA Data Center
GSA Data Center Exterior Shot

GSA Data Center

Charlotte, NC

170,000 SF 5-Story Office Building, 35,000 SF Mission Critical 24/7 Space

GSA Data Center Exterior Shot
GSA Data Center Interior Lobby
GSA Data Center Alternate Exterior
GSA Data Center Exterior Shot
GSA Data Center Exterior Shot
  • Tier IV with 45,000 SF of white space
  • Built to Homeland Security blast requirements
  • Fully N + 1 compliant
  • 10 megawatt capacity
  • Four (4) 2.25 megawatt Cat generators supply backup power
  • Blast rated precast and curtain wall exterior
  • Dual UPS systems supporting all building function
  • FM 200 throughout white space
  • 1400 tons of cooling
  • Removal of 60,000 cy of rock
  • Computer modeling of MEP systems for coordination
  • 142 miles of electrical cabling
  • 45,000 SF of 36” raised access flooring and 4,200 SF of 8” raised floor
  • Eighteen (18) month initial handover
  • Design/partnering approach
  • 32’ tall precast
  • Two (2) dock doors and levelers
  • 25,000 SF office area fully furnished
Qualcomm
Qualcomm Reception Area

Qualcomm

Raleigh, North Carolina

125,000 SF

Qualcomm Reception Area
Qualcomm Server Room
Qualcomm Interior Hallway
  • 5-story floor tenant fit up
  • 2,000 SF data center/white space
  • Production labs
  • Security card access
  • Remote monitoring and alarming for the building management system
  • Tier II
SSA Data Center
SSA Data Center Aerial Exterior

SSA Data Center

Durham, NC

105,000 SF Office Building

SSA Data Center Chiller Pipes Interior
SSA Data Center Aerial Exterior
  • Tier II
  • The project was completed in seventeen (17) months, four (4) weeks ahead of schedule
  • 2,000 SF data center/white space
  • 345 space 4-level parking deck
  • 30,000 SF annex building
Wake Forest Innovation Quarter A1a
Wake Forest Innovation Quarter A1a Expansion Interior

Wake Forest Innovation Quarter A1a

Winston-Salem, NC

Wake Forest Innovation Quarter A1a

Wake Forest Innovation Quarter A1a Expansion Interior
Wake Forest Innovation Quarter A1a Expansion Data Room
Wake Forest Innovation Quarter A1a Interior Shot
  • Tier II with 5,000 SF of white space and N+1 redundancy for all mechanical equipment
  • 5,000 SF disaster recovery center
  • Full generator back-up
  • 3,500 SF renovation to expand existing data center
  • State-of-the-art in-row cooling systems
  • Dual power distribution units (PDUs) for 2N redundancy
  • FM 200 fire suppression system
  • VESDA smoke detection

 

Ashley Furniture Data Center
Ashley Data Center

Ashley Furniture Data Center

Advance, NC

Datacenter Expansion

Ashley Data Center
Ashley Data Center
  • Sixteen (16) computer racks
  • Three (3) 10-ton Liebert in-rack cooling units
  • Additional 75 KVA module added to the existing UPS
  • New electrical panels and circuitry
  • Pre-action fire protection system

“You see it’s not all about the place – it’s the people. People and companies like Shelco that are willing to step up when others said it could not be done and find success the old fashioned way – with know-how, commitment, and hard work. If you ever need a reference for your company on a future project, please don’t hesitate to use USCB. I’ve been doing this for about 20 years and I can’t say I’ve seen a better construction firm.”

—Mike Parrott

USCB Facilities Director