Renovation/Upfit
Since 1978, Shelco has transformed existing spaces into modern, efficient workspaces for a number of unique uses including office, industrial, healthcare, high-tech, educational, student housing and retail. Shelco understands the challenging design, permitting, scheduling and construction requirements for these projects and pays close attention to the details during all phases of construction.

Lowe’s Tech Hub
Charlotte, NC
350,000 SF 15-Story Technology Headquarters Office Upfit
- Lowe’s Global Technology Center
- Monumental stairs with glass railing, precast treads and heavy steel features
- Executive board room with amenity centers
- Two-story auditorium with specialty finishes
- Large training room/presentation center with operable partitions

LendingTree Corporate Headquarters | South End
Charlotte, NC
165,000 SF Corporate Headquarters Upfit Spread Over Six Floors
- High end Class “A” office space with a residential work from home feel
- 300 different finish selections over six floors
- Each floor designed around its own theme to create custom unique spaces
- Custom wood ceilings and monumental stairs
- Two-story amphitheater
- 771 work stations
- 64 conference rooms and 27 open meeting/collaborative spaces
- Recording studio
- Yoga studio

5815 Westpark Drive
Charlotte, NC
68,200 SF Exterior and Interior Renovation of Existing Office Building
- LEED Certified
- EIFS exterior walls with glazed storefronts and ACM panel blade walls with accent trim
- Ornamental grand entry stair with polished concrete treads and landings with a steel sculpture from steel reclaimed from the demo portion of the project
- Hands Free automatic entry and restroom doors
- Operable lobby windows tied to the BMS system for additional fresh air during economizer cycles
- Antimicrobial paint at restroom walls

The Junction at Five Points
Raleigh, NC
45,000 SF Interior Demolition and Renovation of Existing Warehouse
- 35,000 SF office and retail space
- 10,000 SF leasable storage space
- Exterior makeover includes storefront glass and skylights

11000 Weston Parkway
Cary, NC
19,000 SF Interior Upfit of Office Building
- Complete main lobby renovation
- Removal of four story monumental stair with concrete infills at each floor
- Amenities areas including fitness center, locker rooms and restrooms
- Corner café with serving counter and attached kitchen
- Two spec office suites with kitchen/break areas
- Exterior signage installation including monumental, wayfinding and building signage

Xerox
Cary, NC
50,000 SF Interior Upfit
New 2,500amp emergency power switch gear service
Power Over Ethernet lighting
64 TV displays and integrated audio-visual systems

Parsons Executive Office Upfit
Charlotte, NC
40,000 SF Upfit Spanning Two Floors
- Monumental stairs with perforated steel plates with wood treads and landing
- Separate video and audio recording studios
- Interior brick veneer and wood plank walls
- Exposed aggregate polished concrete floors with integrated wood floor planking
- Open ceiling concept with sound control elements
- Demount able partition glass fronts for individual offices/conference rooms
- High STC rated walls and rooms
- Two SCIF areas constructed per the National Counterintelligence and Security Center document ICD/ICS 705

BB&T/Truist Upfits at Corporate Center I & II
Charlotte, NC
129,000 SF Renovation Over Six Floors
- Class A office renovation
- Creation of a whole building employee lounge and fitness center
- Addition of one 2,400 kW generator to an existing building
- Construction of a new MDF room to support the entire building
- Project included all new critical power and critical cooling needs for the building data system
- Update all existing comfort cooling controls systems

NN, Inc. Upfit | Waverly HUB Building
Charlotte, NC
80,000 SF Office Upfit
- Men’s and women’s locker rooms
- Full gymnasium with yoga and cycling room
- 65 offices with 22 traditional conference rooms
- Product innovation room design to showcase NN products
- 2,700 SF auditorium with operable partitions

Hamilton Stephens Steele + Martin, PLLC Attorneys at Law
Charlotte, NC
14,000 SF Office Upfit
- Located in 525 N. Tryon Street Office Building
- Shelco built original building and portion of the upfits
- Relocation of owner’s office
- New LED lighting, fresh paint, new wood baseboard and crown molding
- Gathering space with a wet bar, kegerator, and a glass roll up door for larger parties

SunTrust | Midtown Plaza
Raleigh, NC
25,800 SF Upfit on 10th Floor of Midtown Plaza
- Exposed ceiling hallways
- Full height wall tile and wood paneling in the lobby
- Glass office fronts
- Multiple conference rooms
- Fabric panel benches and banquettes

PCAOB Upfit
Charlotte, NC
7,234 SF Office Upfit
- LEED Gold Existing Building
- Conference room with operable partition
- Unique angular layout and design
- Decorative interior architectural storefront
- Custom millwork at break and copy rooms

PRA Health Science Upfit
Wilmington, NC
13,596 SF Interior Office Upfit
- Full demolition of existing space
- Glass vestibule added to 2nd floor balcony
- Construction traffic accessed the 2nd floor via a temporary scaffolding so no construction traffic used the base building lobbies, corridors or elevators

MassMutual Interior Renovation
Charlotte, NC
17,000 SF Interior Renovation in LEED Gold Existing Building |Capitol Towers South
- Walled private offices
- Borrowed sidelight and hollow metal frames
- New break room
- Completed in three (3) months

Herons Restaurant
Cary, NC
Kitchen Renovation
- Heron’s Restaurant is located within The Umstead Hotel
- Recognized as “Best Restaurant in the United States” by Gourmet Magazine and Aprile
- Renovation of a four diamond restaurant kitchen within a five diamond hotel
- Work completed without hindering the 24/7 operations of The Umstead
- The kitchen’s design has evolved to improve work efficiency
- Included custom made stainless steel kitchen equipment
- The preparation of food can be viewed by restaurant diners through the new glass viewing window

HTC
Durham, NC
27,200 SF Tenant Upfit
- 800 SF rooftop terrace overlooking Durham Bulls Athletic Park
- Located in the Historic American Tobacco Campus
- Collaborative open area office space
- LED Lighting
- Space was designed as “Quietly Brilliant” reflecting the tenant’s technology incubator theme

SAS Building T Dining Renovation
Cary, NC
4,500 SF Patio Renovation
- This fast track project involved the removal of an existing slate patio with a 4” concrete slab
- Fast-track schedule
- Hanover pavers
- Work was completed over the Thanksgiving Holiday weekend in order not to inhibit daily operations

Hanesbrands, Inc.
Winston-Salem, NC
10,000 SF Renovation of 5th Floor Corporate Headquarters
- Five (5) conference rooms and ten (10) executive offices
- Installed over 300 LF of floor to ceiling glass wall system
- Full height glass doors with mag locks and remote card readers
- Worked two (2) shifts to complete project within allowable timeframe

SAS Building F Kitchen Renovation
Cary, NC
2,100 SF Kitchen Renovation
- Underground plumbing replacement
- Fast track construction schedule
- Facility operations were not disrupted during renovation
- Demolition performed after hours

PRA Health Sciences
Raleigh, NC
40,802 SF Office Renovation
- AV package for over twenty-seven (27) TVs
- Marble floors in the lobby, reception and break areas
- The lobby and café areas are lined with “living” botanical walls and illuminated back-painted glass

VACON Phase I
Durham, NC
6,000 SF Tenant Upfit
- Demo existing space
- Electrical engineering firm
- High level finishes
- Project completed in eight (8) weeks
- Glass walled offices that also serve as marker boards

8740 Research Drive
Charlotte, NC
160,000 SF, Four-Story Upfit
- LEED Silver
- Parking lot full depth reclamation
- New employee patio and garden wall
- Expanded main lobby
- Employee shower/locker rooms

ESPN SEC Network
Charlotte
40,000 SF Interior Renovation
- 40,000 SF Interior Renovation
- Multi-phased project
- Completed in seven (7) months
- All work completed at night

Hedrick Gardner
Raleigh, NC
18,142 SF
- Office Upfit at GlenLake V Office Building
- Five (5) conference rooms with glass walls
- Acoustical fabric paneling within conference rooms
- Exposed ceiling with spiral ductwork breakroom

Domtar Upfit
Fort Mill, SC
60,000 SF 3-story Office Upfit
- LEED Certified Existing Building
- 60,000 SF three-story upfit
- Top floor 20,000 SF executive area
- Custom Symbio wall panel modular office construction
- Custom audio/video integrated system for the conference room
- Completed in six (6) months
“I have had an extremely positive experience in all three of these major projects with Shelco and will continue to seek them out as future opportunities present themselves. They operate with a high level of integrity and trust which is so critical to us in a contractor relationship. They communicate well with the owner, architect and our employees who may be impacted by construction activity. From Shelco’s President to the on-site supervisor. I always felt I could access the appropriate level of management at any time. I highly recommend Shelco as a general contractor which should be obvious by our history of retaining them on successive projects and intent to continue the relationship in the future.”